Lville Design

Lville Design

Harrison B.

UPPER ARM SIDE CW 3/29/22
UPPER ARM HW DUE FRIDAY 4/1/22

CW 4/1/22 UPPER ARM COMPLETE
Lower Arm Sketch HW Due 4/4

HW DUE 4/5/22 SMALL METAL DISC
LARGE METAL DISK HW DUE 4/5/22
Lower Arm extrusion and copy hw due on 4/5
CW Tuesday April 5, Print Lower and upper arm
APRIL 5 CW PRINT ALL LOWER AND UPPER ARM PARTS START PUTTING IN MAGNETS

4/11 CW ASSEMBLY OF PARTS

FINSIHED LED LAMP CW 4/15
CW 4/18 DRAWING OF PHONE
CW 4/18 ORTHOGRPAHIC DRAWING OF PHONE

4/18 HW DUE 4/19 BEGINNING OF MODELING OF IPHONE

CW 4/19 MODELING OF IPHONE
HW DUE 4/22 IPHONE
HW DUE 4/22 Iphone
4/22 hw due Iphone
completed phone CW 4/22

completed phone 4/22
4.22 completed phone
4/26 HW due models of phone stand
Model of phone stand 4/26 CW
HW DUE 4/29 Continuing modeling iPhone

Consultation work 5/9 bc not in class due to ap
Hw due5/10 potential sketches for lamp design

5/10 classwork, cut out all remaining parts

5/10 Cw- glued metal disks to base verticals
5/10 Cw- glued base verticals to base plate

5/10 Cw- continued assembly of lamp
HW due 5/13- beginning of lamp design
5/13 Class work. During this period, I continued to build my lamp as seen above. I may have to reprint my base plate and base verticals because there is a small gap between the lower parts and the base verticals.
HW due 5/14- continued work on lamp design

I was absent on saturay may 14 because of a golf match so there will be no work posted for this work period

5/16 during consultation to make up for missed class period. continued to build lamp as well as completed the wiring
Hw due 5/17 continued work on lamp
5/17 CW- Completed lamp during class- show that lights work

Continued work on lamp design- hw due 5/20

Classwork 5/20. Mr brodie let me miss class because I took the AP test that day.

Hw Due 5/25- finished lamp design
Cw-5/25- Helped trevor build lamp